Good evening, and welcome to ChatShow. It is Tuesday, October the twenty-seventh, twenty twenty-six, in the night, and this show is about the United States. I'm Denzai, moderator. The question is: If Georgia considers new nuclear in the 2030s, how do large Vogtle-style reactors, small modular reactors near Savannah River and non-nuclear options compare on cost overrun risk, and who should bear it? The panel will hear every side across twenty minutes: Claudette, Gemmy and Gwen. Claudette, you open. Vogtle units three and four came in years late and billions over the original estimate. What actually drove those overruns, and how did Georgia's Public Service Commission let those costs reach customers' bills?
CS-00001334
What happens if Georgia's utility regulators approve Plant Vogtle-style new reactor builds in the 2030s, should the state fund small modular reactors near Savannah River instead to avoid another cost overrun above ten billion dollars?
Hear it free for a minute then 2 Listens for the rest
A new account starts with 15 credits, 60 Listens; this ChatShow takes 2.
Should Georgia Build Big Reactors or Small Modular Ones After Vogtle?
Put fairly to the panel as: If Georgia considers new nuclear in the 2030s, how do large Vogtle-style reactors, small modular reactors near Savannah River and non-nuclear options compare on cost overrun risk, and who should bear it?
The panel agreed Georgia should stop billing customers during construction, write a hard cost ceiling into statute, and push overrun risk onto shareholders. They split on whether to repeat large AP1000 reactors or build a single capped small modular unit.
Made by ChatShow Ai on October 27, 2026 · 20 minutes · Claudette, Gemmy, Gwen discuss it under Denzai, the chair.
The free minute
The words a listener hears before the first Listen is charged, cut at 1:00.
Vogtle's overruns came from starting construction before the design was finished, then Westinghouse's 2017 bankruptcy, rework and weak labor productivity. Customers paid because a 2009 Georgia law let Georgia Power bill financing costs …
That is the free minute. Hear it spoken, then sign up to carry on with the other 19 minutes for 2 Listens.
Denzai's Rating: 8.2 of 10
Relevance 7.5 · Facts 10.0 · Interest 7.0 · Balance 7.0 (for information)
What a complete answer covers
The standard set before the show, and how Denzai judged each part was met.
- ✓ covered What Vogtle Taught Georgia Ratepayers
- ✓ covered Second AP1000 Cheaper Than First?
- ◐ partly Small Reactors: Promise Versus Record
- ◐ partly How Other Countries Build Nuclear
- ✓ covered Who Should Carry the Risk
- ◐ partly Nuclear Or Something Else Entirely
The fact desk
The fact desk checked 4 claims made on air: 2 supported, 0 contradicted, 2 unverified.
More ChatShows
The latest public ChatShows. All of them in the Gallery.
- Should J.League managers get two review challenges per match? 3 heads · 15 min · 8.1
- Should US Libraries Buy More Manga for Teens on Shrinking Budgets? 3 heads · 15 min · 6.8
- Should Struggling Districts Replace End-of-Year Exams With Portfolios? 3 heads · 15 min · 6.5
- Universal Pre-K or Targeted Aid: Equal Start in Philadelphia 3 heads · 15 min · 6.4!