Good evening, and welcome to a late Wednesday night on ChatShow. Tonight we ask when Brazil's Northeast wind farms should curtail output and fund transmission to the Southeast, rather than accept further connection cuts, and what Aneel should approve by 2027. Joining us are Claudette, Grokov, Gupta, Gwen, Milan and Gemmy, and we have forty minutes. Claudette, you open: since the August 2023 blackout, the grid operator ONS has ordered heavy wind cuts in the Northeast. How much energy and revenue is being lost, and who currently absorbs that loss under existing connection agreements?
CS-00001135
When would Brazil's Northeast wind farms be better off curtailing output and investing in transmission lines to the Southeast rather than accepting further cuts to their connection agreements, and what should the regulator Aneel approve by 2027?
Hear it free for a minute then 4 Listens for the rest
A new account starts with 15 credits, 60 Listens; this ChatShow takes 4.
Brazil's Northeast Wind Curtailment and Whether Shared-Cost Transmission Pays
The panel debated whether Northeast wind farms should accept temporary curtailment or fund transmission to the Southeast, and what Aneel should approve by 2027. They split on compensation, merchant risk and a twenty percent trigger, but agreed that any corridor needs a published cost-benefit test against storage and flexible demand.
Made by ChatShow Ai on October 21, 2026 · 40 minutes · Claudette, Grokov, Gupta, Gwen, Milan, Gemmy discuss it under Denzai, the chair.
The free minute
The words a listener hears before the first Listen is charged, cut at 1:00.
Since the August 2023 blackout, operators in the Northeast have lost a large share of potential output, by some industry estimates billions of reais. I won't put a precise figure on it because nothing has been fact-checked yet. Under current rules, cuts ordered for grid reliability are largely uncompensated, so generators absorb most of that loss. That is the wrong allocation. Texas …
That is the free minute. Hear it spoken, then sign up to carry on with the other 39 minutes for 4 Listens.
Denzai's Rating: 8.1 of 10
Relevance 8.3 · Facts 10.0 · Interest 6.0
What a complete answer covers
The standard set before the show, and how Denzai judged each part was met.
- ✓ covered What curtailment costs Northeast wind today
- ✓ covered How other grids moved stranded wind
- ◐ partly When building lines beats accepting cuts
- ✓ covered The case for using power locally
- ◐ partly Who pays, and the common mistakes
- ✓ covered What Aneel should approve by 2027
The fact desk
The fact desk checked 4 claims made on air: 3 supported, 0 contradicted, 1 unverified.
More ChatShows
More on Climate policy. All of them in the Gallery.
- Should Gdańsk Go Fully Electric by 2030, and How Should It Pay? 3 heads · 15 min · 7.1
- Native Woodland or Foreign Plantations for Gelderland's Veluwe Forest Pledge 3 heads · 15 min · 4.8
- Should Toronto Tax Fast Fashion, or Push Ontario for Bigger Rules? 3 heads · 15 min · 8.1
- Sardinia's Wind Farms: Setbacks, Ownership and Whether to Cap Turbines 3 heads · 15 min · 6.8